Client: Laing O’Rourke Location: Clayton Project Overview: Construction of 634m of DN225 sewer by micro tunnelling and construction of manholes as part of Suburban Rail Loop East Project.
Works completed:
Long term traffic diversion of Clayton Road.
Installation of protection barriers on Clayton Road.
Construction of shaft.
Micro tunnel pushrods in lengths of 100m sections.
Pullback rods and insert steel sleeve.
Construct concrete manholes every 100m.
Backfill shaft with stabilised sand.
Road reinstatement.
Connection to the existing sewer system.
Ground water management including sediment tank disposal.